Q: How to control the products quality?
A: We have always placed great emphasis on quality control to ensure that excellent quality level is maintained.
Q: Where is your main market?
A: Our main market is America, Europe and Middle East .
Q: How long does it take to receive goods?
A: Sample: within 2-7 days
Mass production: delivery time is about 25-30 days after receiving deposit and all design confirmed.
Q: What are the payment terms?
A: T/T 30% deposit and the balance against the copy of B/L or L/C or Trade assurance order .
Q: Is it possible for mark the own brand on the machine?
A: Yes, we can provide OEM and ODM services.